          What should we pay attention to when choosing cable machinery

          author:admintime:2019-09-22 22:12click:
                      When choosing wire and cable, attention should be paid to the selection of wire and cable types and specifications (conductor cross section).
                      1. Selection of Wire and Cable Types            When choosing wires and cables, consideration should be given to their use, laying conditions and safety.
                      According to different uses, power cables, overhead insulated cables and control cables can be selected.
                      According to different laying conditions, general plastic insulated cables, steel tape armoured cables, steel wire armoured cables and anti-corrosion cables can be selected.
                      According to safety requirements, non-flammable cable, flame-retardant cable, halogen-free flame-retardant cable, fire-resistant cable and so on can be selected.
                      2. Selection of wire and cable specifications 
                     When determining the specifications of wires and cables (conductor cross section), the selection conditions such as heating, voltage loss, economic current density and mechanical strength should generally be considered. According to experience, low-voltage power line usually chooses section according to heating condition because of its large load current, and then checks its voltage loss and mechanical strength; low-voltage lighting line, because of its high requirement for voltage level, can choose section according to the allowable voltage loss condition first, then checks its heating condition and mechanical strength; and high-voltage power line, because of its high requirement for voltage level, can choose section according to the allowable voltage loss condition. First, the section is selected according to the economic current density, then the heating condition and the allowable voltage loss of the cable machinery are checked, and the mechanical strength of the high voltage overhead lines should also be checked. If the user has no experience, he should consult the relevant professional units or
                      Personal opinion.
                      Explanation: 1. The current carrying capacity of the same specification aluminium-core conductor is about 0.7 times that of the copper-core conductor. The aluminium-core conductor is larger than the copper-core conductor, the crosslinked polyethylene insulator is smaller, and the refractory wire and cable is larger.
                      3. The calculation capacity of this table is based on three-phase 380V and Cos_ phi=0.85. If single-phase 220V and Cos_ phi=0.85, the capacity should be *1/3.
                      4. When the ambient temperature is high or the open application mode is adopted, the safe current carrying capacity will decrease. At this time, larger specifications should be selected; when used for frequent starting motor, larger 2-3 specifications should be selected.
                      5. The PVC insulated wires in this table are calculated by single overhead laying method. If they are for pipe-piercing or multi-laying, 2-3 specifications should be selected.
                      6. The above data are for reference only. The final design and determination of cable types and specifications should refer to relevant professional information or electrical manuals.
                      Normal, and according to the cable type specifications, length and ambient temperature, the measurement results are corrected appropriately. Small size (solid conductor below 10mm 2) cables should also be measured whether conductors are on or off.
                      6. When laying cables directly, attention should be paid to soil conditions. The depth of laying cables under general buildings is not less than 0.3 meters, and the surrounding environment is more complex, such as arable land, construction sites or roads, etc. A certain depth of laying (0.7-1 meters) should be required to prevent accidental damage to the buried cables. When necessary, the cables should be erected clearly. A marked sign.

          Telephone

          0769-85415700

          function

          Price

          quality

          service

          Wechat sweep

          Mobile phone sweep

          主站蜘蛛池模板: 最新国产成人在线网站| 中文字幕理伦午夜福利片| 五月丁香影院| 邻居少妇张开腿让我爽了在线观看| 国产免费一区二区三区免费视频| 国产H片无码不卡在线视频| 久久妇女高潮喷水多| 一 级做人爱全视频在线看| 亚洲日本中文字幕久久韩国| 中文字幕亚洲男人的天堂网络| 波多野结衣在线精品视频| 欧美在线观看a| 国内自拍偷拍| 久久中文视频| 久久中文字幕日韩精品| 精品国产乱码久久久久久1区二区| 羞国产在线拍揄自揄视频| 亚洲高清中文字幕在线看不卡| 亚洲精品日韩恨恨干| 成人深爱激情网| 久久99国产精品成人欧美| 精品少妇人妻av免费久久久| 国产精品A片| 色综合久久夜色精品国产| 国产亚洲精品资源在线26u| 欧美日产亚洲国产精品| 国产精品高潮呻吟av久久| 国产在线精品熟女| 一本色道久久88加勒比—综合| 国产精品久久久久免费一级| 精品久久久久久无码人妻蜜桃| 久久棈精品久久久久久噜噜| 日本无码中文| 李毅吧500期最新更新后进| 在线播放无码高潮的视频| 91亚洲免费视频| 色噜噜狠狠狠狠色综合久一| 伊人精品成人久久综合97| 亚洲AV片不卡无码久久| 美女福利导航| 国产日韩欧美911在线观看|